As AI infrastructure expands across Southeast Asia, rising rack power densities are placing greater demands on power reliability, cooling performance and infrastructure deployment.
At Data Centre World Asia (DCWA) 2026 in Singapore, we will showcase our integrated AI data centre infrastructure portfolio, spanning nickel-zinc UPS backup power, liquid cooling, and modular AI data centre (AIDC) solutions. Together, these solutions address the needs of both existing facility upgrades and new AI data centre deployments.
Event Information
- Date: 29–30 September 2026
- Venue: Marina Bay Sands, Sands Expo & Convention Centre
- Booth: T40
Nickel-Zinc Battery Cabinet for 15-Minute UPS Backup
We will showcase the 8XNFG90 90Ah nickel-zinc battery paired with the GZC-9038S nickel-zinc battery cabinet, purpose-built for 15-minute UPS backup in IDC and AIDC applications.
Based on a non-flammable aqueous nickel-zinc chemistry with no thermal runaway, the system delivers discharge rates of up to 10C and reliable performance across a wide temperature range, making it well suited to high-power backup in tropical environments. Compared with conventional VRLA solutions, its compact footprint helps save valuable data centre space. With over 90% material recyclability, it also supports sustainability goals while offering an alternative to lead-acid and lithium-ion UPS batteries.
Bluearth LTA 4175 CDU — Sidecar Liquid Cooling for AI Workloads
For high-density AI and HPC cooling, we will present the Bluearth LTA 4175 CDU, a 175 kW / 52U liquid-to-air (L2A) sidecar CDU fully compatible with the NVIDIA Vera Rubin NVL72 platform.
Delivering 175 kW of cooling capacity at ATD = 10°C, the LTA 4175 enables liquid cooling deployment without major facility renovation. It is designed for hybrid cooling and liquid cooling retrofits in existing air-cooled data centres, while also offering a flexible option for mid-size new-build IDC and AIDC projects.
Modular AI Data Centre Solutions
We will also feature our factory-prefabricated Modular AIDC solutions, integrating power, nickel-zinc backup, BMS, direct-to-chip liquid cooling and DCIM monitoring.
Available as 500 kW all-in-one units and configurable 3.5 MW kit-type systems, the solutions can accommodate different AI infrastructure and deployment requirements.
Connect With Us at DCWA 2026
Our integrated solutions address key power, cooling and deployment needs for next-generation AI data centres, from existing site upgrades to new-build projects.
Visit us at Booth T40 to explore our latest solutions and discuss your project requirements with our team.
